This subject was discussed during our lengthy oral meeting.
@dachary highlighted that time will especially constrain what could be done.
I said that:
- first some context is required; i don’t fully understand the steps above. Which user interface? For which workflow? It was initially planned to avoid any interface (using the interfaces of the existing forges and for example a prefix with the federated issues such as
fedeproxy:). Is there an admin user interface? - then the steps need to be split into smaller steps, in the same way the first issues were created for the initial fedeproxy repository - it was during a constructive exchange.
- I agreed that time will constrain the achievable steps and the schedule will reflect that.